Project Overview

Cleveland Construction , Inc. performed as the interior trades contractor for the redevelopment of the Old Post Office building in Washington D.C. into the new Trump International Hotel. The 499,247 SF historic Old Post Office was redeveloped to include 272 luxury hotel units, 39,000 SF of meeting space, and a 13,000 SF grand ballroom, as well as retail, spa, and museum space.

Cleveland Construction was contracted to install metal studs, drywall, fireproofing, and acoustical ceilings within all hotel guestrooms and meeting spaces, the fitness center, and the grand ballroom. Our complete scope of work included rough carpentry, as well as furnishing and installing metal stud framing, gypsum drywall for partitions, exterior gypsum board and cement plaster, acoustical ceilings, soffits, bulkheads, thermal insulation, spray fireproofing, shaft walls, hollow metal and wood doors, and water-resistant backer board in hotel bathrooms and kitchens.

Our team overcame a number of challenges throughout the project that came with working within a century-old building. For example, our team quickly realized that the redevelopment drawings didn’t match what our team was uncovering on site. Since every room had different existing conditions and final layout, our team scheduled daily walkthroughs with Lend Lease and redesigned the room layouts while performing the work. Because of the tight construction schedule, our team was marking these layout changes on paper in the room or directly on the walls to accelerate the room build-outs so other trades to begin their work.

Furthermore, in addition to our team following our company’s safety program for the project, we also followed the site-specific safety plans set forth by Lend Lease and our team was chosen by the council to receive the Gold Award of Excellence for our work at the Trump International Hotel.

Cleveland Construction's performance at Trump International Hotel in Washington DC is an example of our commitment to delivering the highest level of quality and best value while maintaining the contract delivery date.

 

Overview

  • Location
    Washington, D.C.
  • Owner
    Lend Lease
  • Architect
    WDG Architecture, LLC
  • Completion Date
    August 2016

Industries

Services Provided

  • Interior Trades (Self-Preform)
  • Exterior Trades (Self- Perform)
  • Safety Management
  • Quality Assurance/ Quality Control
  • Scheduling
  • LEED/ Sustainable

You have the vision... We make it true®

At Cleveland Construction, our mission is to Make It True®. Whether that’s making the visions of architects come true...building true relationships with subcontractors...staying true to our word with owners and developers...or making our company a truly great career path for employees... our Make It True® mission is what creates the unmistakable trust, loyalty, and teamwork that sets Cleveland Construction people apart.